English

Vol. 7 3, 2017 p 66-73

Pages

Article name, authors, abstract and keyword

66-73

Technical and economic limits to the application of the horizontal direction drilling method in the construction of underwater transitions of main pipelines

Dinar R. Vafin a, Aleksey N. Sapsay b, Dmitry A. Shatalov a

a Pipeline Transport Institute, LLC (Transneft R&D, LLC), 47a, Sevastopolskiy prospect, Moscow, 117186, Russian Federation

b Transneft, 57, Bolshaya Polyanka, Moscow, 119180, Russian Federation

https://doi.org/10.28999/2541-9595-2017-7-3-66-73

Abstract: The application of horizontal directional drilling (HDD) method is widespread in the world practice for construction of underwater passages of main pipelines. In order to assess its economic and technological feasibility, conditions of construction on more than 100 underwater passages were analyzed.
Draft power of drilling rigs while dragging the pipeline are considered in order to determine the maximum possible length of an underwater passage for each size of the pipeline. Depending of the geological conditions, the draft power was distributed into two groups: when dragging in stable and non-stable soils.
The duration of the underwater passage construction with the HDD method depends to a large extent on the length of the passage, the bottomhole area, the engineering and geological conditions at the site and the technology of well drilling. In order to assess the impact of engineering and geological conditions, the constructed passages were distributed according to the volumetric rate of construction in descending order with an indication of emergency situations that occurred during the work. The selection of the approach is based on the need to average the underwater passages according to such parameters as the passage length and diameter, and the number of expansion stages.
Cost of various methods of underwater passage construction (trenching, HDD, microtunneling) was compared according to the item construction of the pipeline route. Underwater passages vary considerably in length and the type of pipe used. The constructive parameter of the underwater passage was applied to bring these criteria to a single value.
Based on the results of consideration of technical and economic aspects of the pipeline route construction, there were introduced technical and economic limitations of the HDD method application for the construction of underwater passages of main pipelines.

Keywords: horizontal directional drilling, underwater passage, main pipeline, emergency situation, technical and economic limitations

Reference for citing:
Vafin D. R., Sapsai A. N., Shatalov D. A. A. Technical and economic limits to the application of the horizontal direction drilling method in the construction of underwater transitions of main pipelines. Naukatekhnol. truboprov. transp. neftiinefteprod. = Science & Technologies: Oil and Oil Products Pipeline Transportation. 2017;7(3):6673.

References:
[1] Sharafutdinov Z. Z., Spektor Y. I., Skrepnyuk A. B., Parizher V. I., Sorokin D. N. Construction of passages of main pipelines through natural and man-made obstacles. Novosibirsk: Nauka; 2013. (In Russ.)
[2] Salnikov A. V. Construction methods for underwater passages of oil and gas pipelines under the Pechora Basin Rivers [text]. In study guide: A. V. Salnikov, V. P. Zorin, R. V. Aginey, editors. Ukhta: Ukhta State Technical University, 2008. (In Russ.)
[3] Kharitonov V. A., Bakhareva N. V. Organization and technology of the pipeline construction with horizontal directional drilling: monograph. Kharitonov V. A., editor. Moscow: Publishing ACB, 2011. (In Russ.)
[4] Sharafutdinov Z. Z., Komarov A. I., Golofast S. L. Expansion of the pilot well for the construction of underwater passages of pipelines. Pipeline Transportation: Theory and Practice. 2016;(5):2836. (In Russ.)
[5] Varlamov N. V., Sharafutdinov Z. Z. Construction of main pipelines. Choice of expansion technology. Oil & Gas Journal Russia. 2011;(10):9296. (In Russ.)
[6] Rotimi Oladunjoye Owowa, Chinwuba Victor Ossia, and Christopher O. Akhigbemidu. Analyses of pipelines for deep horizontal directional drilling installation. American journal of mechanical engineering. 2016;4(4):153162.
[7] Pipeline design for installation by horizontal directional drilling: prepared by the horizontal directional drilling design guideline task committee of the technical committee on trenchless installation of pipelines of the pipeline division of the American society of civil engineers. Edited by Eric R. Skonberg, P.E., Tennyson M. Muindi, P.E. Second edition. pages cm (ASCE manuals and reports on engineering practice; no. 108).
[8] Itay bar-lev standard guide for use of maxi-horizontal directional drilling for placement ofpolyethylene pipe or conduit under obstacles, includingriver crossings; [accessed 2017 February 15]. URL: https://www.academia.edu/5368483/Designation _F_1962_99_ Standard_ Guide_for_Use_of_Maxi-Horizontal_Directional_Drilling_ for_Placement_of_Polyethylene_Pipe_or_Conduit_Under_Obstacles_Including_River _Crossings.